
Today the protective structure began operating in test mode.
The shelter has the highest security class A-4 and is designed for 400 people. The total cost is almost 73 million hryvnia. These are funds from the fund for eliminating the consequences of armed aggression and the regional budget.
There is a heating, ventilation, water supply system, and a diesel generator installed in case of a long blackout.